Project Introduction

Vietnam Kra 800tpd graphite mineral dressing plant project was finished, which is one of our successful projects. Xinhai Design & Research Institute undertook the task of its graphite ore beneficiability test. According to the test report, technical staff designed flotation process of two stages one close-circuit crushing, one stage one-circuit grinding and classification, one roughing- two scavenging-ten cleaning.

Vietnam Kra 800tpd Graphite Ore Dressing Plant Project

Through the mineral processing test before beneficiation, technical staff of Xinhai made the conclusion that the graphite had great wash ability, so that the commonly used flotation process, characterized by simple reagents system also, was advanced and reliable beneficiation index, which could create huge economic and social profits, and it was well received by partners.

Ⅰ Mineral Dressing Test

The test was mainly for the recycle of graphite. The sample for test was prepared and sent by client. The raw ore would be ground first, and then after one roughing- two scavenging-ten cleaning, the test would finally receive output 14.2% , fixed carbon content 92.30%, the recovery rate 87.91%. In order to get some of high-carbon graphite, the graphite plant processing would be into wet screening, then the +140mm concentrate output 3.68%, fixed carbon content 95%; -140mm concentrate output 10.72%, fixed carbon content 91.46%. (Attached PDF of Test Report).

Mineral Dressing Test
Mineral Dressing Test

Ⅱ Packaging and Shipping

Mining equipment manufactured by Xinhai were about to pack and ship.

PACK & SHIP

ship order
Mining equipment manufactured by us were about to pack and ship.
Mining equipment manufactured by us were about to pack and ship.
Mining equipment manufactured by us were about to pack and ship.

Ⅲ Equipment Schedule

According to the client requirement, the followings were the mining equipment for this project.

Name of equipment Model amount Motor Power(KW) voltage(V)
Vibrating Feeder ZSW-380*95 1 11 380
Jaw crusher PE500×750 1 55 380
Impact crusher PFCQ1010 1 90 380
Round Vibrating Screen YA1548 1 15 380
Belt Conveyor TD75-8063 3 15 380
Belt Feeder PG650×1500 2 2*2.2 380
High Weir Spiral Classifier FLGT-2000 1 18 380
Grid Type Ball Mill MQT1557 1 132 380
High Efficiency Agitation Tank GBJ-2500×2500 1 15 380
High Efficiency Agitation Tank GBJ-2000×2000 1 7.5 380
Flotation SF-8 3 3*30 380
Flotation JJF-8 7 7*22 380
Flotation SF-4 3 3*15 380
Flotation JJF-4 9 9*11 380
Flotation SF-2.8 33 33*11 380
Auger conveyor LXG-Φ250×4000 1 5.5 380
Agitation Tank for Chemical Reagent BJW-2000×2000 1 5.5 380
Press Filter XMZ-200/1250 2 2*4 380
Submerged Slurry Pump 65QV-SP 5 5*7.5 380

Ⅳ Installation of Equipment

Related equipment were set up, so the engineers teem was doing installation and commission.

INSTALLATION

installation and commission
installation and commission
installation and commission
installation and commission
installation and commission
installation and commission
installation and commission
installation and commission

Ⅵ Commission of Equipment

Related equipment were set up, so the engineers teem was doing installation and commission.

COMMISSION

installation and commission
installation and commission

Ⅶ Personnel Training

In order to help workers to be familiar with their works as soon as possible, Xinhai technicist did practical operation training for them, and helped workers pay attention to some details which was usually uneasy to be noticed but extremely important.It could build their own technical team and lay the foundation for the stable operation later.

TRAINING

Personnel Training
Personnel Training
Personnel Training
Personnel Training

Ⅷ Designed Capacity Reached

Vietnam Kra 800tpd graphite ore dressing plant project finally got the recovery rate 92%. Prospective earnings was 48 million dollars. Xinhai provided one-stop service for this project, including mineral testing, engineer design, equipment manufacture, installation & commissioning and local training and designed capacity reached. Xinhai is focused on providing the most professional mineral equipment and solution for clients.

xinhai ball mill
xinhai ball mill

Graphite Ore

800t/d
SOLUTIONS
dewatering device dewatering device dewatering device dewatering device dewatering device dewatering device dewatering device dewatering device

Capacity Reached